CNG & CBG Station Setup in India

What We Support

Compressor Coordination

Coordination with OEMs for compressor supply, skid integration, and pre-commissioning. Our experience with Chicago Pneumatic (Atlas Copco Group) compressors provides strong technical familiarity with systems used across CNG stations.

Cascade Assembly & Supply

Support for cascade frame fabrication, cylinder sourcing, and assembly, ensuring compliance with design pressure requirements and PESO specifications.

Instrumentation Supply

As a Parker Hannifin Authorized Distributor in India, we supply instrumentation tubing, CPI and A-LOK fittings, valves, and accessories with complete traceability and documentation for compliance.

Dispenser Coordination

Sourcing and coordination of CNG and CBG dispensers from verified manufacturers, aligned with overall station design and requirements.

Pre-Commissioning Support

Support for leak testing, pressure testing, and instrumentation checks to ensure systems are ready before commissioning.

CNG & CBG Station Setup in India

From Equipment to Commissioning

CNG and CBG station setup in India requires coordination across multiple systems including compression, storage, dispensing, instrumentation, safety, and regulatory approvals. Any gap in execution can delay commissioning and impact project timelines.

MechTech Energies supports CNG and CBG station projects in India with strong expertise in procurement, coordination, and execution support. We work closely with CGD operators, EPC contractors, and project developers to ensure equipment is correctly specified, compliant, and delivered on time.

service1

CBG Station Setup — Key Considerations

CBG stations involve additional technical considerations due to gas composition and process variability.

We support with:

  • Equipment selection aligned with gas quality parameters
  • Instrumentation selection suitable for bio-gas service (SS316L recommended)
  • Coordination aligned with applicable regulatory requirements

Documentation Support

  • Equipment data sheets and compliance certificates
  • Material Test Certificates (MTC) for PESO submission
  • Vendor documentation packages
  • As-built records for instrumentation and equipment

Our Approach

We engage at the specification stage, understanding gas composition, pressure design, and site requirements before recommending solutions. This ensures correct procurement, reduces delays, and supports smooth project execution.